A Typical Residential Roof Installation Timeline

You’re probably not going to install your own roof. Nevertheless, knowing the process end-to-end can help you manage your project and recognize signs of potential delays. In today’s post, local roofing contractor Pawcatuck Roofing Company. shares an overview of a typical roof replacement timeline.

Planning Stage

Once you have decided on getting a new roof, you’ll be spending time on comparing roofing materials, styles and other roofing options. This will be followed by weeks contacting roofing contractors, comparing quotes, and, later, securing financing for your project.

Before Installation

Signing the contract is usually followed by a one or two-week period, during which your contractor will secure permits, order materials, and deliver them to your home. Prior to installation day, you can use this time to prepare your home by covering furniture and appliances with dust covers. You will also need to clear space in your yard. Roofing contractors typically deliver roofing materials ahead of installation day.

Installation

The first day of roof replacement will begin with preparations, which usually takes about an hour or two. Work areas will be prepared to prevent damage to parts of your home. Landscaping will be covered with tarpaulin, while paths will be covered with boards. The old roof will then be stripped down to the decking. Discarded materials will be collected in dumpsters provided by your roofing contractor. Removal may take up the entire first day on large roofs.

The roof deck will be inspected for hidden structural issues such as moisture damage, with repairs being performed as needed. The rest of the roof will then be installed, starting with underlayment. Depending on the complexity of your chosen roofing system, the rest of the installation process may last from a few days to as long as two weeks. The finished roof will undergo a quality inspection conducted by the roofing contractor or a representative from the roofing manufacturer.

After Installation

The work areas will be cleaned up thoroughly after the new roof is completed. The yard will be swept with large magnets to remove stray nails, while high-powered vacuum cleaners will be used for removing dust and debris. Depending on your agreement with your contractor, they or a local recycler will collect the dumpsters with the old roofing. A representative from your contractor will follow-up after a few days to collect the final payment, complete your warranty registration and answer further questions that you may have.

Pawcatuck Roofing Co. is your leading provider of roofing repair and installation services. Give us a call at (860) 940-2343. You can also fill out our contact form to schedule an appointment. We serve customers in Connecticut and Rhode Island.

Robert Holland

Recent Posts

Why New Windows Are Essential for Your Home 

When it comes to protecting your home from extreme weather conditions like hurricanes, new windows…

4 months ago

Comparing Roofing Materials: Asphalt Shingle vs. Standing Seam Metal Roofing vs. Cedar Roofing

When it comes to choosing the right roofing material for your home, there are several…

11 months ago

Why Springtime is the Perfect Opportunity for a New Roof Installation

Experience the Benefits of A Springtime Roof Installation with Pawcatuck Roofing Company Springtime presents the…

11 months ago

It’s OK To Install A New Roof In The Winter

As the temperature drops and snow starts to fall, roof replacements probably aren’t at the…

1 year ago

Pawcatuck Roofing Company Pledges Full Roof Donation for Ocean Community Chamber of Commerce’s Building Expansion Campaign

Pawcatuck Roofing Company is proud to announce its involvement in a significant community initiative by…

1 year ago

Seamless Gutters vs Gutter Guards: Which One is Right for Your Home?

When it comes to protecting your home from water damage, gutters play a crucial role.…

2 years ago